Renovation
Home Renovation in Toronto and York Region
Bathrooms, kitchens, flooring, basements, paint and tile, doors and windows, whole-home. Mr Jin runs the crew and schedules each trade; after the measure you get a plan and an itemised quote.
Renovation services
Prices vary with size, materials and site conditions. The quote issued after the measure is the binding one.
Bathroom renovation
Quoted after measure
Strip-out, waterproofing, tile, fixtures, ventilation and lighting.
Kitchen renovation
Quoted after measure
Cabinets, countertops, tiled walls, relocated plumbing and electrical.
Flooring
Priced by area
Laminate, engineered hardwood and vinyl plank, including levelling and baseboards.
Basement finishing
Quoted after measure
Framing, insulation, ceilings, floors, bathrooms and separate-entrance work.
Painting
Priced by area
Walls, ceilings, trim and baseboards, including filling, sanding and masking.
Tile work
Priced by area
Floor and wall tile, shower waterproofing, large-format tile.
Doors and windows
Quoted after measure
Interior doors, frames and hardware, plus casing and trim finishing.
Whole-home renovation
Quoted after measure
Phased room by room on a set schedule, with one quote broken down by item.
How a job runs
Measure
On-site measurements, a look at plumbing, wiring and structure, and a talk about budget.
Plan
Layout, material direction and order of works are settled, with changes flagged early.
Quote
Labour, materials and timeline listed item by item, including what you supply.
Build
Each trade comes in on schedule with Mr Jin supervising; the site is cleaned daily.
Walk-through
We check the work together, list anything outstanding, and finish it before final payment.
Choosing materials
The questions that come up most often at the measure.
Do I buy the materials, or do you?
Either works. If you buy, we give you a list of sizes, quantities and model numbers. If we buy, it is billed at invoice cost and listed separately on the quote.
What tile size should I choose?
Large tiles mean fewer grout lines and a roomier look, but they need flatter surfaces, so levelling and labour cost more. Shower floors do better with smaller tile or mosaic.
What flooring works in a basement?
Basements hold moisture, so waterproof vinyl plank or tile is usually right and solid hardwood is not. Levelling and a moisture barrier go down first.
Quartz or natural stone countertops?
Quartz needs no sealing and resists stains; natural stone has unique veining but needs maintenance and dislikes acids.
What grade of paint should I buy?
Bathrooms and kitchens want a scrubbable, moisture-resistant finish; other rooms are fine with standard latex. Dark-to-light needs an extra primer coat.
For real estate agents
Pre-sale and pre-lease renovation
When a listing is weeks away, the money goes where buyers look: paint, floors, kitchen and bath finishes, doors and hardware. The schedule is built backwards from your listing date.
Scheduled to your listing date
Photography and hand-over dates come first; the work order is built around them.
Tiered quotes
A must-do list and a nice-to-have list for the same unit.
Works with off-shore owners
Photo updates throughout, in English or Chinese, with someone on site.
Completed work
Project photographs are being collected — real images will fill these spaces.
photo to come
photo to come
photo to come
photo to come
photo to come
photo to come
Book a free measure
Fill in the fields and send it as a text, or copy it into WeChat. The measure is free and you decide after seeing the quote.
Or call (289) 501-5259